PLPD’s 2023 project in repairing the Pike Lake/Rubicon River Breach (see photo) appears to be helping. New growth is being seen in the area along with reduced water flow through the breach. We will continue to monitor the situation and look at the possibility of adding additional brush to the breach area in the winter months.